Seiko 7B24 Manuale Utente Pagina 6

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 12
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 5
6
5. Installation and Connection
5.1 HEATER BODY installation
2. Pass TUBE SET through the each hole of
HEATER CAP COVER and HOLDER CAP
HEATER CAP COVER
HOLDER CAP
4. Tighten TIP NOZZLE and HOLDER CAP.
5. Put through HEATER HOLDER and put MOUNTING BRACKET.
HEATER HOLDER
MOUNITNG BRACKET
1. Cover HEATER COVER
to HEATER BODY.
HEATER COVER
HEATER BODY
3. Pass TUBE SET through HEATE BODY and
TIP NOZZLE.
TIP NOZZLE
After power on, HEATER has high temperature.
So please DO NOT touch directly.
Vedere la pagina 5
1 2 3 4 5 6 7 8 9 10 11 12

Commenti su questo manuale

Nessun commento